- Levelling the ground at the Musituni site
- Concrete mixing at the Musutuni construction site
- Levelling the base of the Spring at Musituni
- Musituni villagers prepare the ground for construction of the Protected Spring
- Laying the concrete base of the Protected Spring
- Laying the steps to the taps at Musituni
- Engineers at Musituni measure the height of the tap
- The Protected Spring construction takes shape
- Finishing the concrete on the water tank at Musituni
- Clearing a path to the new Protected Spring at Musituni
- Musituni Protected Spring is open for business! Many thanks to Stride Ltd in Denmead for the generous donation.
- No more dirty water at Musituni – the Protected Spring is up and running